New Vernon Parish Water System

Vernon Parish outgrew its water system, calling for an expanded system to serve almost twice the number of customers. The original system was designed by MML&H in the early 1990s. The new water system features 150 miles of water mains ranging in size from 2" to 12", three elevated tanks with a total capacity of 500,000 gallons and three additional water wells with a combined capacity of up to 1.3 million gallons per day.

MML&H was involved in this project from inception to completion, handling the design, bidding, construction administration and inspection of the new water system over the course of two years, and continues to provide engineering and consulting services to the East Central Vernon Parish Water System as the parish grows and prospers, addressing needs as they arise.