Sugarhouse Road, Phase 1 Alexandria, LA
The City of Alexandria and Meyer, Meyer, LaCroix & Hixson, Inc. are pleased to announce that the first phase of a multi-phased major roadway project has been completed....
View MoreBoyce Recreation Area Dock, Red River
Meyer, Meyer, LaCroix & Hixson, Inc. was selected to be the Engineer of Record by the Red River Waterway Commission to design and administer the Boyce Recreation Area Dock...
View More
Southwest Louisiana Veteran's Cemetery, Jennings
Working with the Joint Venture Team of Barron, Heinberg and Brocato (architects) and CARBO (landscape architect), MML&H served to provide structural and civil engineering for...
View MoreCentral Louisiana Technical Community College, Alexandria
After a significant public outreach effort, downtown Alexandria was the site selected for the new Central Louisiana Technical Community College. In order to satisfy current...
View More
Natchitoches Rue Beauport Riverfront
The City of Natchitoches and the Cane River Waterway Commission initiated a large-scale redevelopment project along the banks of the Cane River in downtown Natchitoches. Meyer,...
View More
5,000 Ton Concrete Storage Dome, Central Louisiana Regional Port, Alexandria, LA
Meyer, Meyer, LaCroix & Hixson, Inc. was selected to be the Engineer of Record by the Central Louisiana Regional Port to design and administer the construction of an addition...
View More
Widen & Pave South Entrance Roadway, Veterans' Affairs Medical Center, Pineville, LA
This goal of this roadway project was to widen and pave the existing south entrance to the VA Medical Center in Pineville, Louisiana. The existing gravel road was narrow and had...
View More
Boise Cascade Wood Products Plant, Lena, LA
This large manufacturing facility is located on a 60 acre tract of land, about 20 miles north of Alexandria, Louisiana on La. Hwy. 1. Boise Cascade manufactures engineered wood...
View More
Natural Gas System Improvements, Elizabeth, LA
This project expanded the Town of Elizabeth's natural gas distribution system to serve the MARTCO Oakdale Oriented Strand Board (OSB) plant. The project consisted of a new city...
View More
Water System Improvements, Brouillette Water System, Inc., Avoyelles Parish
This $1.95 million project was funded by USDA Rural Development. This vital water improvement project was separated into two separate contracts, Contract 1 - Water Distribution,...
View More
Haynesville Shale Natural Gas Exploration, Red River, Sabine, DeSoto and Natchitoches Parishes
MML&H's responsibilities generally include land surveying and support services to the gas exploration activities and operations in the Haynesville Shale natural gas field of...
View More
Wastewater Treatment Plant - New Bar Screen, Walker, LA
A new mechanical bar screen was added with the expansion of the Walker Wastewater Treatment Plant to a capacity of 1.5 MGD. The bar screen was installed in a new headworks...
View More
Runway and Taxiway Seal Coating and Remarking, Jena Airport, Jena, LA
Meyer, Meyer, LaCroix & Hixson, Inc. was the prime consultant for all engineering services for the runway and taxiway seal coating and remarking project at the Jena Airport....
View More
Wastewater Treatment Plant Improvements, Oakdale, LA
This project was jointly funded through a low-interest loan of approximately $2,750,000 from the Department of Environmental Quality Clean Water State Revolving Fund (DEQ-CWSRF)...
View More
Vandenburg Drive Lift Station, Alexandria, LA
The Vandenburg Drive Lift Station is part of the ongoing LA Highway 28 West Sewer System Improvements project for the City of Alexandria. The purpose of these sewer improvements...
View More
Eagle Point Drive Drainage, Farmerville, LA
The spring floods of March 2016 left the Town of Farmerville with several areas of significant flood damage. Most of the damage occurred on the first day of the flood event...
View More
Christus Community Clinic, Alexandria, LA
MML&H provided site and structural engineering design and construction administration services for the 13,300 square foot Emergent Care Center for Christus IWCC in Alexandria...
View More
Versailles Boulevard Extension, Alexandria, LA
Recognizing the importance of an urban collector roadway to serve the rapidly growing southwest Alexandria area, the City invested $16 million in infrastructure improvements. MML...
View More
City of Alexandria Water Tank
When the City of Alexandria decided their 70+ year old, one million gallon welded steel water tank needed to be repaired and painted, MML&H was selected for the project....
View More
England Airpark Roundabout
Known to be on the 'cutting edge', the England Authority initiated the Roundabout Project at the intersection of England Drive and Vandenburg Drive in 2010, giving Central...